First it was time to install a traveler - the original setup might have been good for 1977, but it didn't cut it by today's standards. You can see the "Y" setup that made the mainsheet 2-1. It had these crappy jam cleats in the middle so you could -kind of- control the main. Anyway, it never worked for us. So I'm installing a new Harken big boat double car traveler.

Once I looked at the bridge deck it was clear that it wasn't up to the task - the trav has a safe working load of 5000lbs and I should make the rest of it up to the task. I refastened the teak that was there, then went and built a new beam out of Sapele to bolt the trav on to - this beam bolts to the cockpit sides and won't go anywhere. It also stiffened up what was there, so it's very robust.


I through bolted the whole thing to the other beams as well. Install was tight, and I wish I could have made it a bit longer but it will do the job.
Here it is bolted in from the underside:

I then replaced all 10 million plugs on the trav and clamped the whole thing down in a couple of places that needed it.

Tomorrow I will trim the plugs and sand it all down.